Year One

IMG_1225.jpg

A group installation project centred around ideas of ‘home’. The pieces were made in a way that they could be worn and used as part of a procession. The Bartlett was moving from it’s temporary home at 132-140 Hampstead Road back to 22 Gordon Street and as such the year-group processed from the old to the new carrying architectural artefacts to from an installation.

 
Aro+Ha_0387.jpg

The pieces were installed on the Bartlett’s balcony where nature and the weather were allowed to decay the temporary structure.

 

Year One Building Project

A Bath House in East London

Original Wash House facade in City of London

Original Wash House facade in City of London

 
 
Proposed site adjacent to the existing bath house building

Proposed site adjacent to the existing bath house building

Paper model at 1:200 showing bathing topology

Paper model at 1:200 showing bathing topology

 
 
Paper Model at 1:200 showing bath house

Paper Model at 1:200 showing bath house

IMG_2776.jpg

1:200 model in site

 
IMG_3630.jpg

1:100 Plan and section of Bath House on A1 showing bathing pools

 
Previous
Previous

Year 2 Project 1: Exploring the 'Third Space' of the Whale

Next
Next

Volunteering PLACE NI